Note that status is now maintained in the IDR github: https://github.com/ietf-wg-idr/idr-chairs/blob/main/status.md
Some items retained to provide some context to work in flight that is not maintained in the github repository. It will be cleaned up as time permits. (JMH - 20 June, 2026.)
To effeciently handle drafts along, we are considering drafts in existing IDR chartered technology (Segment Routing, BGP-LS, Flow Specification v2 (FSv2), IPv6, and new Tunnel Encapsulation drafts) different than other drafts. Existing IDR Chartered Technologies will receive reviews prior to WG Adoption. An interim will be held per IETF cycle where WG drafts and individual drafts for these technologies can present revision or new draft.
| draft | Shepherd | Status | Next step | Adoption cycle | Post-Adoption | ETA |
|---|---|---|---|---|---|---|
| draft-zzhang-idr-tunnel-encapsulation-label-stack | Keyur Patel | Needs revision | TBD | 12/23 to 1/13 | 2/28/2023 | TBD |
| draft | Shepherd | Status | Next step | Adoption complete | Post-Adoption | ETA |
|---|---|---|---|---|---|---|
| draft-ali-idr-srv6-policy-sl-opt-distribution-00 | Susan Hares | Pre-Adoption review (IETF-122 request) | Adoption call | TBD | TBD | rename + revision -01 |
| draft-chen-idr-mbinding-00 | Sue Hares | Held for Spring WG check | Interest for adoption | 4/12-5/12/2023 | 5/12/2023 | TBD |
| draft-lin-idr-sr-policy-admin-flags | Susan Hares | Pre-Adoption (IETF-122 request) | adoption call | TBD | TBD | revision -02 + Spring Bits check |
| draft-lin-idr-sr-policy-headend-behavior-04 | Susan Hares | await -05 | Pre-adoption review | TBD | TBD | await -05 |
| draft-wu-idr-bgp-segment-allocation-ext-13 | Susan Hares | author hold | IPR check | TBD | TBD | TBD |
| draft | Shepherd | Status | Next step | Adoption complete | Post-Adoption | ETA |
|---|---|---|---|---|---|---|
| draft-chen-idr-bgp-ls-sr-policy-nrp-05 | Susan Hares | Pre-Adoption review | Adoption call | TBD | TBD | await -06 |
| draft-zhang-idr-sr-policy-template-04 | Susan Hares | Pre-Adoption Review | Adoption Call | Await -05 + Review | TBD | Needs Spring WG OK |
| draft-zzd-idr-policy-scheduling-08 | Susan Hares | Pre-adoption (IETF-122 request) | adoption | TBD | TBD | needs -09 revision |
| draft | Shepherd | Status | Next step |
|---|---|---|---|
| draft-ietf-idr-best-external | Sue Hares | Expired Draft, Implementations Exist | Republish draft, WGLC? |
| draft-ietf-idr-add-paths-guidelines | Sue Hares | Expired Draft, Informational? | Determine if WG wishes to progress? |