Shepherd reports for each drafts are listed by draft in alphabetical order.
Categories are: WG LC, WG drafts, adoption of individual draft, or individual draft (pre-adoption).
none
none
draft-ietf-idr-bgp-sr-mpls-elp-00 - (-01) to (-04), renamed (-00) - Allocation Oked, at IANA, Needs -05 after IANA allocation
draft-ietf-idr-sr-p2mp-policy - (-00) - Requested status update on 1/5/2025, If no response draft will be put on inactive list.
draft-ietf-idr-sr-policy-ifit - (-00 - 11) - Needs -12 prior to early allocation
draft-ietf-idr-sr-policy-metric - (-00) to (-03) - Needs -04 for early allocation
draft-ietf-bgp-sr-policy-nrp - (-00) to (-06) - Needs -07 prior to IESG publiation request
draft-ietf-idr-sr-policy-path-mtu - (-09) to (-14) - In early allocation call (1/5/2026 to 1/19/2026)
draft-ietf-idr-sr-policy-path-segment - (-11) to (-14) - **[-14] Holding on Ketan ack on reverse path length issues
draft-ietf-idr-sr-policy-seglist-id - (-00) to (-06) - Needs iDR Chairs review prior to WG LC. WG LC IPR call done (1/5/2026 to 1/12/2026)
draft-ietf-idr-sr-te-policy-attr - (-00) to (-03) - needs -04 with correct registry name
draft-chen-idr-bgp-sr-policy-cp-validity - (-02) to (-04) - Needs -05 to resolve issues prior to adoption
draft-jiang-idr-sr-policy-composite-path - (-00) to (-03) - Needs -04 to resolve issues prior to adoption
draft-lin-idr-sr-policy-headend-behavior - (-01 to -05) - Needs -06 and Adoption call
draft-lin-idr-sr-policy-admin-flags - (-03) - Needs -04 prior to adoption call
draft-liu-idr-sr-segment-list-optimize - (-00) to (-01) - Needs -02 prior to adaoption call
draft-zhang-idr-sr-policy-enhanced-detnet - (-03) - Needs -04 prior to WG adoption
draft-zhang-idr-sr-policy-template - (-03) to (-07) - **Needs to send a summary of why the Spring WG thinks templates are ok **
draft-zzd-idr-sr-policy-scheduling - (-03) tp (-10) - Need -11 and discussion
Shepherd reports for each drafts are listed by draft in alphabetical order.
Categories are: WG LC, WG drafts, adoption of individual draft, or individual draft (pre-adoption).
draft-ietf-idr-bgp-ls-bgp-only-fabric (-03 to -04) - Needs -05 for IANA sub-registry alignment with RFC9552. (1/5/2026)
draft-ietf-idr-bgpls-inter-as-topology-ext -18 - Needs -20 with Edits based on Chairs's reviews (2/8/2025)
draft-ietf-idr-bgp-ls-isis-flood-reflection (-04) - Needs -05 - Requested resonse by 1/12/2025.
draft-ietf-idr-bgp-ls-link-mtu - (-07) to (-10) - needs -11 with correct registry name
draft-ietf-idr-bgp-ls-sr-epe-over-l2bundle - (-00) to (-01) - Needs -01 to address technical errors in text, 2 implementations
draft-ietf-idr-bgp-ls-sr-policy-nrp (-00) tp (-02) - Needs -03, SR draft passed WG LC
draft-ietf-idr-bgp-ls-sr-policy-path-segment (-07) to (-10) - Holding awaiting changes in linked SR draft on reverse path
draft-ietf-idr-bgp-ls-sr-service-segments - (-02) - Needs -03, draft expired. Queried authors on "inactive"
draft-ietf-idr-bgp-ls-te-path - (-01) to (-02) - Need -03, draft expired, authors queried
(none)
draft-ali-idr-srv6-policy-sl-opt-distribution-00 - (-00) to (-01) - -01 can be adopted, Needs -02
draft-chen-idr-bgp-ls-algo-related-adjacency-sid - (-04) - Needs -05 prior to adoption
draft-chen-idr-bgp-ls-security-capability - (-03) - Needs -04 prior to adoption
draft-chen-idr-bgp-ls-sr-policy-cp-validity - (-01) to (-03) - -03 can be adopted, Needs -04 for RFC and IANA update
draft-dong-idr-bgp-ls-scalable - (-00) to (-02) - Needs -03, under IDR chair joint review (pending ETA 2/6/2026)
draft-li-idr-bgpls-sr-policy-composite-path (-06) to (-07) - Depends on BGP SR draft, holding for SR draft adoption
draft-lin-idr-bgpls-te-policy-pm - (-03) to (-07) - authors interested in continuing, Review pending (ETA 2/6/2025)
draft-lin-idr-bgp-ls-sr-policy-admin-flag - (-01) to (-02) - pending -02 review (ETA 2/6/2026)
draft-liu-idr-bgpls-sr-p2mp-policy-distribution - (-03) to -(-04) - Revew in progress, comparing with BESS drafts
draft-liu-idr-bgp-ls-srp-flexible-path-selection - (-00) to (-01) - Needs -02 prior to adoption
draft-lp-idr-bgp-ls-sr-policy-supplement - 05 - pending review
draft-ls-idr-bgp-ls-service-metadata-08 - [00]((/group/idr/Shepherd-SR-BGP-LS/BGP-LS-SR/draft-ls-idr-bgp-ls-service-metadata) - pending review 05
draft-tong-idr-bgp-ls-savnet (-00) - pending review of -00 (ETA 2/26/2026)
draft-tong-idr-bgp-ls-sav-rule-03 -- pending review of -03 (ETA 2/09/2026)
draft-wu-idr-bgp-segment-allocation-ext - (-14) - Needs -15 with updated references and text.