=June 07, 2021 Interim on Flow Specification =
Interim page
Minutes
Slides
Summary of results
The meeting discussed the following motivations for flow specification v2:
The move to a full TLV format will introduce a new type of error - well formed but invalid TLV.
The alternate to flow specification v2 is extending flow specification v1. This alternative has been investigated by two proposals:
The result of the interim is that developers and those deploying flow specification desired:
The gray area after the interim is the existing drafts with redirect functions. The WG will be required at IETF 111 on this point.
These drafts are required to have v1 and v2 format forms
draft-hares-flowspec-v2-02.txt (replaced by editor's version)
The content of this page was last updated on 2021-06-21. It was migrated from the old Trac wiki on 2023-01-28.